Prof.dr. R.B. Polder

publicaties
A Proposal for Determining the Remaining Time to Chloride Induced Corrosion Initiation of Existing Reinforced Concrete Structures

peer reviewed : Y

High Tech Concrete: Where Technology and Engineering Meet (2018)

auteurs

  • Rob Polder
  • M.M.R. Boutz
  • Marc Ottele

redacteuren

  • D. Hordijk
  • M. Lukovic
Accelerated Testing for Chloride Threshold of Reinforcing Steel in Concrete

peer reviewed : Y

High Tech Concrete: Where Technology and Engineering Meet (2018)

auteurs

  • Rob Polder
  • M van Put
  • WHA Peelen

redacteuren

  • D. Hordijk
  • M. Lukovic
Chloride Ingress of Carbonated Blast Furnace Slag Cement Mortars

peer reviewed : Y

High Tech Concrete: Where Technology and Engineering Meet (2018)

auteurs

  • Patrick Holthuizen
  • Oguzhan Copuroglu
  • Rob Polder

redacteuren

  • D. Hordijk
  • M. Lukovic
The steel–concrete interface

peer reviewed : Y

Materials and Structures (2017)

auteurs

  • Ueli M. Angst
  • Mette R. Geiker
  • Alexander Michel
  • Christoph Gehlen
  • Hong Wong
  • O. Burkan Isgor
  • Bernhard Elsener
  • Carolyn M. Hansson
  • Raoul François
  • Karla Hornbostel
  • Rob Polder
  • Maria Cruz Alonso
  • Mercedes Sanchez
  • Maria João Correia
  • Maria Criado
  • A. Sagüés
  • Nick Buenfeld
Lithium migration in a two-chamber set-up as treatment against expansion due to alkali–silica reaction

peer reviewed : Y

Construction and Building Materials (2017) 12 pagina's , p. 324-335

auteurs

  • L.M. Silva De Souza
  • Rob B. Polder
  • Oğuzhan Çopuroğlu
The effect of two types of modified Mg-Al hydrotalcites on reinforcement corrosion in cement mortar

peer reviewed : Y

Cement and Concrete Research (2017)

auteurs

  • Zhengxian Yang
  • Rob Polder
  • J. M.C. Mol
  • C Andrade
Experimental support for new electro active repair method for reinforced concrete

peer reviewed : Y

Materials and Corrosion (2016) 7 pagina's , p. 600-606

auteurs

  • M. R. Geiker
  • R. B. Polder
Application examples of performance-based specification and quality control

peer reviewed : Y

RILEM State-of-the-Art Reports (2016) 70 pagina's , p. 197-266

auteurs

  • H. Beushausen
  • M. G. Alexander
  • C. Andrade
  • M. Basheer
  • V. Baroghel-Bouny
  • D. Corbett
  • R. D’Andréa
  • A. Gonçalves
  • J. Gulikers
  • F. Jacobs
  • A. V. Monteiro
  • S. V. Nanukuttan
  • M. Otieno
  • R. Polder
  • R. Torrent
Chloride transport testing of blast furnace slag cement for durable concrete structures in Norway

peer reviewed : Y

Fib symposium 2016: Performance-based approaches for concrete structures (2016) 7 pagina's , p.

auteurs

  • Rob Polder
  • M.R. de Rooij
  • CK Larsen
  • B Pedersen

redacteuren

Critical chloride concentrations in reinforced concrete specimens with ordinary Portland and blast furnace slag cement

peer reviewed : Y

Heron (2016) 21 pagina's , p. 99-119

auteurs

  • Jose Pacheco
  • R. B. Polder
vakken
2010 - Behoud en onderhoud van materialen in constructies
2011 - Behoud en onderhoud van materialen in constructies
2014 - Behoud en onderhoud van materialen in constructies
2013 - Behoud en onderhoud van materialen in constructies
2015 - Behoud en onderhoud van materialen in constructies
2012 - Behoud en onderhoud van materialen in constructies
2017 - Behoud en onderhoud van materialen in constructies
2016 - Behoud en onderhoud van materialen in constructies
nevenwerkzaamheden
-Werknemer niet-TUD - TNO

2017-01-01 - 2018-01-01

Advisering/onderzoek en overig